Read-oriented integration
Connectors read from historians, control gateways, CMMS, ERP and document stores through approved interfaces.
Platform
Zimam does not replace your historian, CMMS or ERP. It reads from them, builds engineering context, reasons about consequence, and produces decisions your teams can approve and execute.
Intelligence architecture
Each layer is independently governed. Data flows upward; authority flows downward.
Historians, SCADA gateways, IoT platforms, CMMS, ERP, document repositories and field reporting — read through governed, approved integrations.
Manuals, drawings, procedures, standards and past investigations parsed into retrievable engineering knowledge with source traceability.
Assets, processes, dependencies, criticality, operating envelopes and organisational responsibility modelled as one connected context.
Specialised reasoning agents investigate signals, retrieve engineering evidence, test hypotheses and assemble an explainable diagnosis.
Candidate interventions compared across production, cost, safety, workforce and regulatory criteria to produce a next-best action.
Role-based review, explicit authorisation, audit evidence and access controls. No operational action occurs without recorded human approval.
Outcomes are recorded against recommendations so accuracy, acceptance and realised value improve with every decision cycle.
How Zimam works
Integrate industrial and enterprise data without replacing existing systems.
Build context around assets, processes, constraints and operational objectives.
Identify anomalies, probable root causes, dependencies and consequences.
Compare actions using production, cost, safety, workforce and regulatory criteria.
Generate an approved execution plan, record outcomes and improve future recommendations.
A human approval checkpoint sits before any operational execution. Zimam recommends; authorised people decide.
Integration posture
Zimam is deployed as an intelligence layer alongside operational technology, not inside the control loop.
Connectors read from historians, control gateways, CMMS, ERP and document stores through approved interfaces.
Zimam issues no set-point or control action. Any future write path requires explicit, contracted authorization.
Your historian, CMMS and ERP remain the systems of record. Zimam adds the reasoning between them.
Deployment topology and data residency are configured to the customer's operating environment.
Every conclusion carries its supporting signals, documents and assumptions.
Start on a single asset or decision domain, then extend by unit, site and enterprise.
Security, deployment, and governance configurations are defined according to each customer's operational environment and requirements.
Bring us the asset, process, or operational problem. We will help determine whether it is suitable for a focused Zimam pilot.